skip to content

Rowloft / field notes

How to Keep Track of Increases in Knitting

A shaping instruction can contain several counts at once: the row you are on, the interval between increase rows, the number of increase rows worked, and the stitches now on the needles. Keeping only one number makes it easy to lose the relationship between them.

A small shaping checklist can hold those details without rewriting the whole pattern. Use it to record when an increase is due and whether you worked it. Keep the designer's instructions beside it for the actual technique and placement.

Identify exactly what the pattern is counting

Read the entire shaping passage before starting. Note the initial stitch count, the first increase row, the repeat interval, the number of repetitions, and the final stitch count if supplied.

Also check for instructions that happen at the same time. A piece may have neck shaping at one edge while another shaping sequence continues at the other. A single tally labelled “increases” will not tell you which action you completed.

Distinguish an increase row from an individual increase. If a row adds one stitch at each end, that is one increase row but two added stitches. Your record should say which quantity it measures.

If the wording is ambiguous, consult the pattern's notes or designer. Do not build a schedule around a guess about whether the first worked row is included in “repeat” or whether a count describes each side separately.

Choose a section starting point

Use a clearly defined origin for your row numbers. That might be the first row after a cuff, the start of a sleeve section, or the point named in the pattern.

Write the origin beside the checklist. “Section row 1 is the first row after the cuff” is much easier to interpret later than an unexplained list of numbers.

If you also track total project rows, keep that number separate. There is nothing wrong with the total showing 42 while a shaping-section counter shows 12, provided both labels are clear.

Avoid resetting a useful total without preserving it. A new section counter or a written offset can keep your earlier work traceable when you return to make a matching piece.

Write out the due rows

For a purely hypothetical example, suppose the instructions explicitly say to work an increase on section row 4, then on rows 8, 12, and 16. Your checklist can simply list those four due rows.

Each row has a box you check only after completing its shaping. Beside it, leave space for the resulting stitch count. You now have separate records for the scheduled instruction and the action you actually took.

For a constant interval, you can check your transcription with this calculation:

Next due row = previous due row + interval.

In the example, the interval is four rows: 4 to 8, 8 to 12, and 12 to 16. That does not mean working four plain rows after row 4 and increasing on row 9. The explicit schedule removes that potential counting mistake.

This example explains recordkeeping only. Do not substitute its interval or row numbers for those in your own pattern.

Calculate a stitch-count checkpoint

Where every increase row adds the same number of stitches, the expected total is:

Starting stitches + (completed increase rows × stitches added per increase row).

Suppose, only for illustration, you start with 40 stitches and add two stitches on each of four increase rows. The expected total after the fourth increase row is 48: 40 + (4 × 2).

That calculation assumes no other increases, decreases, cast-ons, or bind-offs happen in the section. If the pattern includes those, account for them separately rather than using the simplified total.

Compare your calculated result with the designer's final stitch count when available. A disagreement is a reason to reread the instructions before knitting, not a reason to overwrite the published count. Check whether you included the initial increase row and whether the repetition count applies to additional repeats.

Keep the row count and shaping tally separate

A row counter answers “How many rows have I completed?” A shaping tally answers “How many scheduled increase rows have I worked?” Those are different questions.

Rowloft supports additional counters within a project, so you can keep a section-row count and a separately labelled shaping tally. A note can hold the due-row list and the expected final stitch count. This is a place to record your schedule, not a claim that the app interprets the pattern for you.

With paper, use the same arrangement: one row sequence and a separate list of shaping checkpoints. Keep the sheet with the pattern so that you can check the original wording whenever the abbreviated record is not enough.

Whatever tool you choose, advance the completed-row count at a consistent moment. Check the shaping box only once you have worked the required action.

Check the fabric at each shaping checkpoint

After an increase row, check the stitch count when practical. Catching a discrepancy near the point where it happened gives you less fabric to inspect.

If the count is wrong, first check whether you counted correctly and whether the row is fully finished. Then compare the shaping on both edges, or wherever the pattern places it. An unchecked box does not prove you missed the increases; you may have forgotten to update the record.

Do not add a compensating stitch somewhere convenient just to reach the expected number. The placement and type of increase can affect fit and appearance. Decide how to correct the fabric using the pattern and an appropriate technique reference.

When you remove rows, update both records. An increase removed from the fabric should no longer remain marked as completed.

Leave a note before the next session

At a stopping point, record the last completed section row, the number of increase rows finished, the live stitch count, and the next due row.

For the invented schedule above, a useful note after row 10 might be:

“Section row 10 complete. Two increase rows done. 44 stitches. Next increase: row 12.”

If you stop partway through an increase row, say which shaping actions you have already worked. Do not mark the entire row complete while one edge is still unfinished.

Keep records for matching pieces separate. The second sleeve needs its own progress count, even if it follows the same schedule as the first.

FAQ

  • Does every fourth row mean four plain rows between increases? Not in a schedule such as rows 4, 8, 12, and 16: there are three intervening rows between those increase rows. Read the full pattern wording and write out the actual due rows before starting.
  • Can I use the same checklist for decreases? Yes, as a recordkeeping method. Track the due rows and completed shaping separately, and subtract the stitches removed when calculating checkpoints. Follow the pattern for decrease placement and technique.
  • What if two shaping schedules overlap? Give each schedule its own named checklist. Mark both actions on a row where they coincide, and calculate the stitch count using all changes that apply to that section.